Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Volvo XC60 Plug-in Hybrid concept car (2012) first pics

Wed, 04 Jan 2012

Volvo will showcase its latest plug-in hybrid technology in the new 2012 XC60 Plug-in Hybrid concept car at next week's Detroit auto show. The Swedes have been developing a range of plug-in hybrid cars, using both petrol and diesel. The hybridised V60 which goes on sale in Europe later in 2012 uses diesel, whereas the new SUV drinks from the green pump.

Fiat 500 Colour Therapy added to UK 500 range

Fri, 10 Aug 2012

Fiat has added the 500 Colour Therapy – a retro-look Fiat 500 – to the model range in the UK. The Fiat 500 belongs to the same school of marketing as the MINI, so a new trim range to cash in on its ‘Homage to an Icon’ status seems an obvious route to garner a few more sales for the very likeable 500. Which is why the UK is getting the Fiat 500 Colour Therapy, a new model range that sits in the 500 line-up between the Pop and Lounge trim levels and comes in five retro-inspired colours - New Age Cream, Countrypolitan Yellow, Pasodoble Red, Volare Blue, and Tech House Grey.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.